Southwestern Pennsylvania Commission
About UsPublicationsRegional Data CenterPlanning & DevelopmentTransportationOur RegionVisitor Info
HomeEmploymentRFPsStaff DirectoryContact UsSite IndexGlossaryLinksSearch
         

 

Transportation

Multimodal Planning

Transportation Operations
& Safety

Congestion Management Process (CMP)
Intelligent Transportation Systems (ITS)
Regional Operations Plan
Regional Traffic Signal Program
Safety Planning
Safety Action Plan
Traffic Incident Management (TIM)

Data & Modeling

Plans & Programs

Public Participation

Contact Transportation

Department Director:
Doug Smith
(412) 391-5590 x327

Manager, Transportation Operations & Safety
Domenic D'Andrea
(412) 391-5590 x341



SPC Logo

Two Chatham Center Suite 500
112 Washington Place
Pittsburgh, PA 15219
Directions
(412) 391-5590 (P)
(412) 391-9160 (F)
comments@
spcregion.org

Directions

TRANSLATE
PAGE

 
Project Location Description
Indiana Borough/White Twp SR 286 SINC-UP Project Oakland Avenue (SR 286)/Philadelphia St (SR 4032) from 13th Street to 3rd Street Oakland Avenue (SR 286) from Plaza Road to Indian Springs Road plus intersection of Indian Springs and Warren Road Equipment upgrades and coordinated retiming of 21 intersections. Equipment upgrades include new controllers and LED indications.
Transportation Operations & Safety

Regional Traffic Signal Program

Completed Signal Projects in Second Program Cycle

Project Location Description
Homer City SINC-UP Project Intersection of Main Street (SR 3035) and Elm Street Signal warrant study and either removal or equipment upgrades at one intersection.
Project Location Description
City of Butler SINC-UP Project State Route 8 from Roosevelt Blvd. to Penn Street; plus 12 intersections along SR 68/356 corridors Equipment upgrades and coordinated retiming of 22 intersections. Equipment upgrades include new controllers, radio interconnect system, and GPS
Project Location Description
Cranberry Twp./Adams Twp./ Seven Fields Borough SR 228 SINC-UP Project SR 228/Freedom Road Corridor from Heritage Creek Rd. to Powell Road Installation of new countdown pedestrian signals at 5 intersections and retiming of 21 intersections along SR 228/Freedom Road corridor
Project Location Description
Cranberry/Marshall Twps. SR 19 SINC-UP Project SR 19 from Brush Creek Road to North Boundary/Glen Eden Road Installation of new countdown pedestrian signals at 3 intersections and retiming of 12 intersections along SR 19 corridor
Project Location Description
Buffalo Township SR 356 SINC-UP Project SR 356 (3 intersections): Monroe Road, Coal Road, Buffalo Plaza Dr. Equipment upgrades and coordinated retiming of 3 intersections along SR 356. Equipment upgrades
Project Location Description
Kitanning Borough SINC-UP Project                                Market Street corridor and intersection of Walnut Street and Water Street Equipment upgrades and coordinated retiming of 5 intersections in downtown Kitanning
Project Location Description
Pleasant Hills/Baldwin/South Park SINC-UP Project Curry Hollow Road (SR 2040) between Green Drive and Cemetary Dr/ Rite Aid Dr. Equipment upgrades and coordinated retiming of 5 intersections along Curry Hollow Road corridor
Project Location Description
Municipality of Mount Lebanon Bower Hill Road SINC-UP Project Bower Hill Road from Kelso Road to Carnegie Drive Equipment upgrades and coordinated retiming of 7 intersections along Bower Hill Road.
Project Location Description
Municipality of Monroeville SINC-UP project State Route 22 from Sams Club/Kohl's Dr. to Mosside Blvd./Haymaker Rd. (SR 48) State Route 48 (Mosside Boulevard) from Old Wm. Penn Highway to MacBeth Drive Equipment upgrades at 8 intersections and coordinated retiming at 16 intersections. Equipment upgrades include new controllers and radio spread spectrum interconnect system. Also includes potential removal of signal at former Value City.
Project Location Description
Kennedy Township SINC-UP Project Pine Hollow Road and McCoy Rd/ Kenmawr Plaza Dr. Equipment upgrades and retiming of 2 intersections. Equipment upgrades include detection and LED Indications
Project Location Description
City of Pittsburgh SINC-UP Project Baum Boulevard (PA-380) from Craig Street to Penn Circle West Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
Project Location Description
City of Pittsburgh SINC-UP Project Centre Avenue from Craig Street to Euclid/ Penn Circle South Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
Project Location Description
City of New Castle SINC-UP Project Washington Street (SR 422) from South Croton to Greenwood Avenue Mill Street from Home Street to Long Street Equipment upgrades and coordinated retiming of 8 intersections. Equipment upgrades include new controllers and new LED indications. Signal warrant studies will be conducted for intersections along Mill Street.
Project Location Description
Hempfield Township SINC-UP Project SR 136 from Woodward Drive to Hempfield High School Dr. Equipment upgrades and coordinated retiming of 4 intersections along SR 136. Equipment upgrades include new controllers, GPS, and new detection
Project Location Description
Unity Township SINC-UP Project SR 30 from SR 981 to Theater Street Equipment upgrades and coordinated retiming of 4 intersections along SR 30.
Project Location Description
Rostraver Township SINC-UP Project SR 51 from Concord Lane/Harper Drive to SR 981 Equipment upgrades and retiming of 4 intersections. Equipment upgrades include new detection at Harper Dr.
Project Location Description
Georges Township SINC-UP Project SR 119 and SR 857 Equipment upgrades and retiming of 1 intersection.
Project Location Description
PennDOT-SR 51 SINC-UP Project SR 51 from Peters Creek Road to Overbrook Boulevard Assist PennDOT with minor upgrades and retiming of 28 intersections on SR 51 corridor.
Project Location Description
PennDOT SR 88 SINC-UP Project SR 88 from McNeilly Road to Corrigan Drive Assist PennDOT with minor upgrades and retiming of 14 intersections on SR 88 corridor.
Project Location Description
PennDOT SR 8 corridor SINC-UP Project SR 8 from Kitanning Street to Sandy Hill Road Assist PennDOT with minor upgrades and retiming of 30 intersections on SR 8 corridor.
Project Location Description
PennDOT SR 837 corridor SINC Project SR 837 from East Waterfront Drive to W. 8th Avenue Assist PennDOT with retiming of 15 intersections on SR 837 corridor.

Mouse over a dot on the map to view
the location and description, or click here to view a text-only listing of each approved project.

Signal Projects in Second Program Cycle

Project Location Description

Indiana Borough/White Twp SR 286 SINC-UP Project

View the Before/After Video for this project!

Click Here To View The Full Project Summary! (PDF, 2.53 MB)

Oakland Avenue (SR 286)/Philadelphia St (SR 4032) from 13th Street to 3rd Street Oakland Avenue (SR 286) from Plaza Road to Indian Springs Road plus intersection of Indian Springs and Warren Road Equipment upgrades and coordinated retiming of 21 intersections. Equipment upgrades include new controllers and LED indications.
[ top ]
Project Location Description
Homer City SINC-UP Project Intersection of Main Street (SR 3035) and Elm Street Signal warrant study and either removal or equipment upgrades at one intersection.
[ top ]
Project Location Description

City of Butler SINC-UP Project

View the Before/After Video for this project!

Click Here To View The Full Project Summary (Rt 8 & 356)! (PDF, 3.71 MB)

Click Here To View The Full Project Summary (SR 356)! (PDF, 3.61 MB)

State Route 8 from Roosevelt Blvd. to Penn Street; plus 12 intersections along SR 68/356 corridors Equipment upgrades and coordinated retiming of 22 intersections. Equipment upgrades include new controllers, radio interconnect system, and GPS
[ top ]
Project Location Description

Cranberry Twp./Adams Twp./ Seven Fields Borough SR 228 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.33 MB)

SR 228/Freedom Road Corridor from Heritage Creek Rd. to Powell Road Installation of new countdown pedestrian signals at 5 intersections and retiming of 21 intersections along SR 228/Freedom Road corridor
[ top ]
Project Location Description

Cranberry/Marshall Twps. SR 19 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.19 MB)

SR 19 from Brush Creek Road to North Boundary/Glen Eden Road Installation of new countdown pedestrian signals at 3 intersections and retiming of 12 intersections along SR 19 corridor
[ top ]
Project Location Description

Buffalo Township SR 356 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.53 MB)

SR 356 (3 intersections): Monroe Road, Coal Road, Buffalo Plaza Dr. Equipment upgrades and coordinated retiming of 3 intersections along SR 356. Equipment upgrades
[ top ]
Project Location Description
Kitanning Borough SINC-UP Project                                Market Street corridor and intersection of Walnut Street and Water Street Equipment upgrades and coordinated retiming of 5 intersections in downtown Kitanning
[ top ]
Project Location Description

Pleasant Hills/Baldwin/South Park SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.3 MB)

Curry Hollow Road (SR 2040) between Green Drive and Cemetary Dr/ Rite Aid Dr. Equipment upgrades and coordinated retiming of 5 intersections along Curry Hollow Road corridor
[ top ]
Project Location Description

Municipality of Mount Lebanon Bower Hill Road SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.5 MB)

Bower Hill Road from Kelso Road to Carnegie Drive Equipment upgrades and coordinated retiming of 7 intersections along Bower Hill Road.
[ top ]
Project Location Description

Municipality of Monroeville SINC-UP project

View the Before/After Videos for Rt 48!
View the Before/After Videos for Rt 22!

Click Here To View The Full Project Summary! (PDF, 2.55 MB)

State Route 22 from Sams Club/Kohl's Dr. to Mosside Blvd./Haymaker Rd. (SR 48) State Route 48 (Mosside Boulevard) from Old Wm. Penn Highway to MacBeth Drive Equipment upgrades at 8 intersections and coordinated retiming at 16 intersections. Equipment upgrades include new controllers and radio spread spectrum interconnect system. Also includes potential removal of signal at former Value City.
[ top ]
Project Location Description

Kennedy Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.31 MB)

Pine Hollow Road and McCoy Rd/ Kenmawr Plaza Dr. Equipment upgrades and retiming of 2 intersections. Equipment upgrades include detection and LED Indications
[ top ]
Project Location Description

City of Pittsburgh SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.75 MB)

Baum Boulevard (PA-380) from Craig Street to Penn Circle West Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
[ top ]
Project Location Description

City of Pittsburgh SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.75 MB)

Centre Avenue from Craig Street to Euclid/ Penn Circle South Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
[ top ]
Project Location Description

City of New Castle SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.11 MB)

Washington Street (SR 422) from South Croton to Greenwood Avenue Mill Street from Home Street to Long Street Equipment upgrades and coordinated retiming of 8 intersections. Equipment upgrades include new controllers and new LED indications. Signal warrant studies will be conducted for intersections along Mill Street.
[ top ]
Project Location Description

Hempfield Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.45 MB)

SR 136 from Woodward Drive to Hempfield High School Dr. Equipment upgrades and coordinated retiming of 4 intersections along SR 136. Equipment upgrades include new controllers, GPS, and new detection
[ top ]
Project Location Description

Unity Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.41 MB)

SR 30 from SR 981 to Theater Street Equipment upgrades and coordinated retiming of 4 intersections along SR 30.
[ top ]
Project Location Description

Rostraver Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.49 MB)

SR 51 from Concord Lane/Harper Drive to SR 981 Equipment upgrades and retiming of 4 intersections. Equipment upgrades include new detection at Harper Dr.
[ top ]
Project Location Description
Georges Township SINC-UP Project SR 119 and SR 857 Equipment upgrades and retiming of 1 intersection.
[ top ]
Project Location Description

PennDOT-SR 51 SINC-UP Project

Click Here To View The Full Project Summary! (PDF, 2.08 MB)

SR 51 from Peters Creek Road to Overbrook Boulevard Assist PennDOT with minor upgrades and retiming of 28 intersections on SR 51 corridor.
[ top ]
Project Location Description

PennDOT SR 88 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 1.5 MB)

SR 88 from McNeilly Road to Corrigan Drive Assist PennDOT with minor upgrades and retiming of 14 intersections on SR 88 corridor.
[ top ]
Project Location Description

PennDOT SR 8 corridor SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.71 MB)

SR 8 from Kitanning Street to Sandy Hill Road Assist PennDOT with minor upgrades and retiming of 30 intersections on SR 8 corridor.
[ top ]
Project Location Description

PennDOT SR 837 corridor SINC Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.39 MB)

SR 837 from East Waterfront Drive to W. 8th Avenue Assist PennDOT with retiming of 15 intersections on SR 837 corridor.

[ top ]

For questions about Regional Traffic Signal Initiatives, contact Domenic D’Andrea at (412) 391-5590 x341 or e-mail ddandrea@spcregion.org.

[ top ]

 

 

Traffic Technician II

Doing Business With SPC
Supplier Registration Form
Current RFPs:
Current RFQs:
All Staff
Communications
Finance

Information Systems

Planning & Development

Transportation
Site Index Home (# - C)
Site Index D - P
Site Index R - Z
The Commission
All Member Listing
Meeting Agenda & Minutes
Officers & Executive Committee
Transportation Technical Committee
Transit Operators Committee
ARC Area Development
SPC Mission Statement
The Corporation
Officers & Board
Staff Directory
Loan Review Committee
Annual Budgets
Meeting Schedule
2017/2018 Meeting Schedule Up to June 2018 (PDF)
Transit Obligations
Data Library
Municipal Profiles; Population; Households & Housing; Economy & Employment; Population, Households, and Workplace Employment Forecasts; Maps
Natural Infrastructure
Request Maps
Aerial Photography
Prints
Digital Orthophotographs
Community Assistance
Broadband Outreach & Aggregation
Local Technology Assistance Program
Local Food Value Chain Initiative
Keystone Opportunity Zones - Tax-Free Business!
Multimodal Planning

Transportation Operations
& Safety

Data & Modeling

Plans & Programs

Public Participation

CommuteInfo

ATWIC
Allegheny County
Map | Commissioners
Armstrong County
Map | Commissioners
Beaver County
Map | Commissioners
Butler County
Map | Commissioners
Fayette County
Map | Commissioners
Greene County
Map | Commissioners
Indiana County
Map | Commissioners
Lawrence County
Map | Commissioners
Pittsburgh
Map | Commissioners
Washington County
Map | Commissioners
Westmoreland Co.
Map | Commissioners
Overall Region
Highways, Airports, etc
Official Tourism Sites For All Our Counties/Members:

Copyright © 2017 Southwestern Pennsylvania Commission. All Rights Reserved. General Disclaimer
Southwestern Pennsylvania Commission | Two Chatham Center, Suite 500
112 Washington Place | Pittsburgh, PA 15219
P: (412) 391-5590 | F: (412) 391-9160
Directions
| Parking

The Pittsburgh region  
Translate This Page:

  Lake Arthur

Note: Google Translator is a third-party resource and a computer translation of the original webpage. It is provided for general information only and should not be regarded as complete or accurate.
Go to top of page.

SPC

About Us Publications Regional Data Center Planning & Development Transportation Our Region
SPC Mission Statement
The Commission
All Member Listing
Meeting Agenda & Minutes
Officers & Executive Committee
Transportation Technical Committee
Transit Operators Committee
ARC Area Development
The Corporation
Officers & Board
Staff Directory
Loan Review Committee
Audit Committee
Meeting Schedule
2015/2016 Meeting Schedule Up to June 2016 (PDF)
Transit Obligations
Data Library
GIS Maps (Free & Specialty)
On The Move . . . Basic Guide To Transportation Planning For Citizens
Public Participation Plan
Regional ITS Architecture (PDF)
The Report On Environmental Justice
Transportation Studies
 
 
Data Library
Census Data Sheets
Maps: Regional Demographic Maps, Census Tract Maps
Aerial Photography
Prints
Digital Orthophotographs
Request Maps
Community Assistance
Broadband Outreach & Aggregation
Local Technical Assistance Program
Zerotaxes.org
SPC Water Resource Center
Air Quality
Operations & Safety
Regional Operations Plan
Intelligent Transportation Systems
CommuteInfo.org
 
Allegheny
Commissioners | Map
Armstrong
Commissioners | Map
Beaver
Commissioners | Map
Butler
Commissioners | Map
Fayette
Commissioners | Map
Greene
Commissioners | Map
Indiana
Commissioners | Map
Lawrence
Commissioners | Map
Pittsburgh
Commissioners | Map
Washington
Commissioners | Map
Westmoreland
Commissioners | Map

[ top ]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 