Our Region
Allegheny County
Armstrong County
Beaver County
Butler County
Fayette County
Greene County
Indiana County
Lawrence County
Pittsburgh
Washington County
Westmoreland County

Transportation: Operations & Safety: Regional Traffic Signal Program

[ Signal Program Home ] [ Regional Traffic Signal Database ] [ Studies & Useful Links ]
[ Completed Projects in 2nd Program Cycle ] [ Completed Projects in 1st Program Cycle ]
[ Re-Timing Videos for 2nd Program Cycle ]
[ Re-Timing Videos for 1st Program Cycle ]

Project   Location   Description

Indiana Borough/White Twp SR 286 SINC-UP Project

View the Before/After Video for this project!

Click Here To View The Full Project Summary! (PDF, 2.53 MB)

  Oakland Avenue (SR 286)/Philadelphia St (SR 4032) from 13th Street to 3rd Street Oakland Avenue (SR 286) from Plaza Road to Indian Springs Road plus intersection of Indian Springs and Warren Road   Equipment upgrades and coordinated retiming of 21 intersections. Equipment upgrades include new controllers and LED indications.
Project   Location   Description
Homer City SINC-UP Project   Intersection of Main Street (SR 3035) and Elm Street   Signal warrant study and either removal or equipment upgrades at one intersection.
Project   Location   Description

City of Butler SINC-UP Project

View the Before/After Video for this project!

Click Here To View The Full Project Summary (Rt 8 & 356)! (PDF, 3.71 MB)

Click Here To View The Full Project Summary (SR 356)! (PDF, 3.61 MB)

  State Route 8 from Roosevelt Blvd. to Penn Street; plus 12 intersections along SR 68/356 corridors   Equipment upgrades and coordinated retiming of 22 intersections. Equipment upgrades include new controllers, radio interconnect system, and GPS
Project   Location   Description

Cranberry Twp./Adams Twp./ Seven Fields Borough SR 228 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.33 MB)

  SR 228/Freedom Road Corridor from Heritage Creek Rd. to Powell Road   Installation of new countdown pedestrian signals at 5 intersections and retiming of 21 intersections along SR 228/Freedom Road corridor
Project   Location   Description

Cranberry/Marshall Twps. SR 19 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.19 MB)

  SR 19 from Brush Creek Road to North Boundary/Glen Eden Road   Installation of new countdown pedestrian signals at 3 intersections and retiming of 12 intersections along SR 19 corridor
Project   Location   Description

Buffalo Township SR 356 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.53 MB)

  SR 356 (3 intersections): Monroe Road, Coal Road, Buffalo Plaza Dr.   Equipment upgrades and coordinated retiming of 3 intersections along SR 356. Equipment upgrades
Project   Location   Description
Kitanning Borough SINC-UP Project                                  Market Street corridor and intersection of Walnut Street and Water Street   Equipment upgrades and coordinated retiming of 5 intersections in downtown Kitanning
Project   Location   Description

Pleasant Hills/Baldwin/South Park SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.3 MB)

  Curry Hollow Road (SR 2040) between Green Drive and Cemetary Dr/ Rite Aid Dr.   Equipment upgrades and coordinated retiming of 5 intersections along Curry Hollow Road corridor
Project   Location   Description

Municipality of Mount Lebanon Bower Hill Road SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.5 MB)

  Bower Hill Road from Kelso Road to Carnegie Drive   Equipment upgrades and coordinated retiming of 7 intersections along Bower Hill Road.
Project   Location   Description

Municipality of Monroeville SINC-UP project

View the Before/After Videos for Rt 48!
View the Before/After Videos for Rt 22!

Click Here To View The Full Project Summary! (PDF, 2.55 MB)

  State Route 22 from Sams Club/Kohl's Dr. to Mosside Blvd./Haymaker Rd. (SR 48) State Route 48 (Mosside Boulevard) from Old Wm. Penn Highway to MacBeth Drive   Equipment upgrades at 8 intersections and coordinated retiming at 16 intersections. Equipment upgrades include new controllers and radio spread spectrum interconnect system. Also includes potential removal of signal at former Value City.
Project   Location   Description

Kennedy Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.31 MB)

  Pine Hollow Road and McCoy Rd/ Kenmawr Plaza Dr.   Equipment upgrades and retiming of 2 intersections. Equipment upgrades include detection and LED Indications
Project   Location   Description

City of Pittsburgh SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.75 MB)

  Baum Boulevard (PA-380) from Craig Street to Penn Circle West   Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
Project   Location   Description

City of Pittsburgh SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.75 MB)

  Centre Avenue from Craig Street to Euclid/ Penn Circle South   Equipment upgrades and coordinated retiming of 11 intersections. Equipment upgrades include new controllers, new fiber, and new radio spread spectrum System
Project   Location   Description

City of New Castle SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 2.11 MB)

  Washington Street (SR 422) from South Croton to Greenwood Avenue Mill Street from Home Street to Long Street   Equipment upgrades and coordinated retiming of 8 intersections. Equipment upgrades include new controllers and new LED indications. Signal warrant studies will be conducted for intersections along Mill Street.
Project   Location   Description

Hempfield Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.45 MB)

  SR 136 from Woodward Drive to Hempfield High School Dr.   Equipment upgrades and coordinated retiming of 4 intersections along SR 136. Equipment upgrades include new controllers, GPS, and new detection
Project   Location   Description

Unity Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.41 MB)

  SR 30 from SR 981 to Theater Street   Equipment upgrades and coordinated retiming of 4 intersections along SR 30.
Project   Location   Description

Rostraver Township SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.49 MB)

  SR 51 from Concord Lane/Harper Drive to SR 981   Equipment upgrades and retiming of 4 intersections. Equipment upgrades include new detection at Harper Dr.
Project   Location   Description
Georges Township SINC-UP Project   SR 119 and SR 857   Equipment upgrades and retiming of 1 intersection.
Project   Location   Description

PennDOT-SR 51 SINC-UP Project

Click Here To View The Full Project Summary! (PDF, 2.08 MB)

  SR 51 from Peters Creek Road to Overbrook Boulevard   Assist PennDOT with minor upgrades and retiming of 28 intersections on SR 51 corridor.
Project   Location   Description

PennDOT SR 88 SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 1.5 MB)

  SR 88 from McNeilly Road to Corrigan Drive   Assist PennDOT with minor upgrades and retiming of 14 intersections on SR 88 corridor.
Project   Location   Description

PennDOT SR 8 corridor SINC-UP Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.71 MB)

  SR 8 from Kitanning Street to Sandy Hill Road   Assist PennDOT with minor upgrades and retiming of 30 intersections on SR 8 corridor.
Project   Location   Description

PennDOT SR 837 corridor SINC Project

View the Before/After Videos for this project!

Click Here To View The Full Project Summary! (PDF, 3.39 MB)

  SR 837 from East Waterfront Drive to W. 8th Avenue   Assist PennDOT with retiming of 15 intersections on SR 837 corridor.

[ top ]

 




Multimodal Planning

Transportation
Operations & Safety

Congestion Management Process

Intelligent Transportation Systems (ITS)

Regional Operations Plan

Regional Traffic Signal Program

Safety Planning

Safety Action Plan

Traffic Incident Management

Data & Modeling

Plans & Programs

Public Participation

Contact Transportation

Transportation

Southwestern Pennsylvania
Commission

Two Chatham Center Suite 500
112 Washington Place
Pittsburgh, PA 15219
Directions
(412) 391-5590 (P)
(412) 391-9160 (F)
comments@spcregion.org

Translate This Page: